Mainline the preferred choice of supplier for ‘Energy from Waste Project’

The Project
Recently challenged with the task to build the main industrial Boiler House, tanks and pipework for a large Energy for Waste site, Mainline was selected as the preferred choice of supplier to help support an Energy from Waste Project.

The Challenge
Ian Wright, the Site Manager, had worked with Mainline on a number of previous projects. Ian required project management assistance from Mainline to survey ongoing requirements and organise equipment to be brought on and off site as the project progressed. Steve Matthews, Account Manager at Mainline worked closely with Ian to offer support at all times, no matter how large or small, expected or unexpected his requirements were.

Mainline Hire
Mainline Hire

The Solution
Various equipment was supplied by Mainline to ensure a smooth running project:

-Roto Telehandlers
-Telehandlers
-Generators and Distribution (280kva & 200kva, 20kva)
-Welders
-Fume Extractors
-Pressure Washer Bowsers
-Lifting and Handling Equipment
-Tower Lights
-Fuel Bowsers
-80’ Arctic Cherry Pickers
-Small Electric Scissor Lifts
-WiFi for Offices
-Storage Containers
-Gas Bottle Storage
-Extraction Fans
-Pumps

Ian Wright, Site Manager for the project, applauded Mainline for their support, “With the full range of kit offered and the backup service provided, it made my job slightly less stressful, particularly as they provide an Account Manager and a back office Sales Coordinator. I challenged Mainline with products and timescales but I was assured that any query I had, would be sorted by the dedicated Account Manager”.

Mainline Hire

Mainline Summary
Steve Matthews, Account Manager at Mainline stated, “We supplied PPE, engineering services, bolts, resin anchors, WiFi for the offices and fuel supply. The range and quality of equipment we have to offer at Mainline was critical to the smooth running of the project to ensure all expectations were delivered on time”.