Ince Biomas – Problem Solved!

The Project

Our long term customer called into Mainline and advised that they had a critical and time-sensitive project that was approaching very soon. The project itself required machinery and services that spanned the whole of Mainline’s offering; along with an extremely tight deadline.

The Challenge

The key challenge here was to organise the delivery and execution of a huge variety of machines and products within a two-week window.

The order was a complete one-stop shop across our total offering and included:

  • 1 x 10m Electric Boom
  • 2 x 16m Diesel Articulated Booms
  • 2 x 20m Diesel Articulated Booms
  • 1 x 8m Electric Scissor
  • 2 x 17m Telehandler c/w Jibs 

The challenge was to get all the machines up to Biomass Chester at the same time so they could start the work immediately as delays would have been detrimental to the timeline of the project.

Our Approach

The approach was simple, get all the required machinery onto three lorries and leave very early to make sure we got to the client for 8 am. This project was both a ‘one-stop shop’ and shows how Mainline loves a challenge and will always go that extra mile for a client.

Customer feedback

The client was extremely pleased that we managed to get all the machines to them on time, in one go.