Mainline help West Bromwich Albion prepare for the new Premier League season

In preparation for the new Premier League season, Mainline machines were selected to help put up two new curved screen scoreboard at the Hawthorns stadium.

Due to it being so close to the start of the new Premier League season nothing was allowed pitch side, so temporary platforms were built to put the machines on. This meant that the machines selected needed to be a light weight.

A 16.81m Tracked Boom (JLG X17J) was selected for its light weight and had the capability to distribute the weight of the machine evenly when all four legs were down. A 13.7m Electric Scissor Lift (Dingli 1612DC) was also selected for its light weight and was used to put sections of the screen in so that they could be carried up and placed in to the corner of the stadium. The 27.38m Diesel Articulated Boom (JLG 800AJ) was chosen due to the height and outreach of the machine. It was able to reach the top of the steel works whilst also having the outreach over the stadiums seating.